Filling: Link 7 & 8. The link energizes when the level drops below the low level probe and de-energizes when it reaches the high level probe. Top and bottom probes are interchangeable.
Emptying: No link between 7 & 8. The relay energizes when the level reaches the high probe and de-energizes when it drops below the low probe.
- For single level sensing connecting pins 5 & 6 (Probes 5 & 7).
- 1s response time to limit effect of water ripple. Longer times manufactured to order.
TE101: Filling or Emptying
TE202: Emptying Only
TE101LE: Long distance Emptying 150-200m 230v and 400v only sfor probes.

